The Ultimate "Plug & Play" Service
Skip the multi-part assembly, avoid setting up the stand, and start splitting logs immediately.
When you select the Titan Pro Gold PDI Service, you aren't just paying for assembly - you are securing total peace of mind. Our certified workshop technicians handle constructing the heavy work stand, filling fluid, and pressure testing, ensuring your machine arrives in 100% working order.
Why is PDI strongly recommended for this machine?
Unassisted assembly of the 7 ton splitter and its work stand involves unpacking dozens of components and takes around 1 hour to build and prime.
With Gold PDI: Simply wheel the splitter off the pallet, plug it into a standard UK socket, loosen the bleed screw, and start splitting! As an added bonus, if you order a Ram Stop Kit with your machine, our mechanics will fit it free of charge.
Lifetime UK Technical Advice Included: Every Gold PDI purchase comes with direct access to our expert technicians whenever you need support.
Delivery & Arrival: Your machine is delivered securely strapped to a pallet via a tail-lift lorry. The driver unloads the pallet directly to your driveway for easy wheeling off the pallet.
Verified Customer Review
"An outstanding piece of kit - copes with all manner of log sizes. It is well built and easy to use - and though very solid it is not difficult to move as it has two wheels. I am very impressed. I would strongly recommend getting Titan Pro to assemble it - it is worth the extra cost."
- David Winkley [Verified Buyer]
Frequently Asked Questions
How does the machine arrive on delivery day?
It arrives fully mounted to its work stand, filled with hydraulic fluid, and securely strapped to a wooden pallet. (Please note: due to courier transport size restrictions, the outer protective safety cage is supplied loose for quick attachment).
Do I need to buy hydraulic oil separately for setup?
No. The Gold PDI package includes 2.9 litres of premium hydraulic fluid pre-filled to the correct level by our technicians in the workshop.
Does Gold PDI cover ongoing machine maintenance?
Gold PDI covers initial workshop assembly, fluid filling, calibration, and dispatch testing. Ongoing routine maintenance (including checking hydraulic fluid levels, loosening the bleed screw during use, and future oil changes) is the responsibility of the owner as outlined in the user manual.
What tools do I need when it arrives?
You will just need basic tools to snip the pallet transport straps and attach the protective safety cage. Once unstrapped, wheel it down, plug it into a standard 230V UK socket, loosen the bleed screw, and start splitting.
What's Included in Your Gold PDI?
Saves Approx. 1 Hour Assembly Time & Includes 2.9L Oil
- Full Work Stand Assembly: Complete construction of the heavy-duty leg frame and secure mounting of the log splitter.
- 2.9 Litres Hydraulic Oil Included & Pre-filled: Filled to the precise operating level with high-grade hydraulic fluid so you do not need to purchase extra oil separately for setup.
- Free Ram Stop Kit Fitting: If a Ram Stop Kit is purchased alongside Gold PDI, our mechanics will fit it free of charge.
- Hydraulic Pressure & Stroke Calibration: Tuned to ensure correct 7 ton splitting force and smooth operation.
- Workshop Hot Test Run: Physically power-tested in our workshop to check for leaks and verify 100% safety lever and switch function.
- Palletised Secure Transport: Delivered pre-mounted on its stand and securely strapped to a pallet for easy wheeling off. (Note: Safety cage provided unattached due to courier transport size limits).
Standard Delivery vs. Gold PDI Assembly
| Feature |
Standard Delivery |
Gold PDI Service |
| Initial Assembly |
Approx. 1 Hour Self-Assembly |
0 Minutes (Ready to Plug In) |
| Initial Hydraulic Oil |
Buy & Fill Separately |
2.9L Oil Included & Pre-filled |
| Ram Stop Kit Fitting |
Self-Fit |
Fitted Free of Charge (If Ordered) |
| Testing & Calibration |
Self-Tested at Home |
Workshop Hot Run & Pressure Calibrated |
| Ongoing Maintenance |
Owner Responsibility |
Owner Responsibility |
Customer Checklist & Ongoing Maintenance Notice
- Initial Setup Included: Gold PDI covers complete stand construction, initial 2.9L hydraulic fluid filling, and workshop testing prior to dispatch.
- Hydraulic Air Bleed Screw: As detailed in the manual, the hydraulic bleed screw must be loosened before each operating session to allow air circulation, and retightened prior to moving or storing.
- Routine Maintenance: Regular operational maintenance (such as checking fluid levels and performing routine hydraulic oil changes) remains the owner's responsibility.
Review this product
You must
sign in to post a product review.