Titan Pro

Tracked Barrow Gold PDI (Full Assembly & Lubricants Service)

Code: TPM250E-GPDI

Save: 31%
£181.00
£124.00 inc. VAT
£103.33 ex.VAT

This service can only be ordered alongside applicable purchases of our TPM250E tracked barrow.

Recommended Extras

The Ultimate "Plug & Play" Service

Skip 4 hours of heavy construction, avoid wooden crate disposal, and get straight to work.

When you select the Titan Pro Gold PDI Service, you aren't just paying for assembly - you are securing total peace of mind. Our certified workshop technicians uncrate your machine, build all structural elements, manage the wiring, fill the gearbox oil, and conduct full operational testing before dispatch.

Why is PDI strongly recommended for this machine?

Unassisted assembly of the Electric Tracked Dumper requires two people, specialised tools, and roughly 4 hours to uncrate, construct the body panels, tension cables, and connect the electrical drive system.

With Gold PDI: Unstrap the barrow from the pallet, ensure the battery is charged, and start moving heavy loads immediately!

Lifetime UK Technical Advice Included: Every Gold PDI purchase comes with direct access to our expert technicians whenever you need support.

Delivery & Arrival: Your machine is delivered pre-assembled and securely strapped to a pallet via a tail-lift lorry. The driver will unload the pallet directly to your driveway.

Verified Customer Review

"Great bit of kit to help us round our small holding. Took advantage of the offer to have it fully assembled before delivery which was a great service - turned up ready charged and ready to work."

- Caroline Solly [Verified Buyer]

Frequently Asked Questions

How does the barrow arrive on delivery day?

It arrives fully assembled and securely strapped to a wooden pallet. We dismantle and dispose of the heavy wooden shipping crate at our workshop so you do not have to worry about disposing of large timber packaging.

Do I need to buy gearbox oil separately for setup?

No. The Gold PDI package includes 2 litres of high-grade gearbox oil pre-filled to the correct level by our workshop technicians.

Does Gold PDI cover ongoing machine maintenance?

Gold PDI covers initial workshop construction, fluid filling, electrical connections, cable tensioning, and dispatch testing. Ongoing routine maintenance (including regular battery charging, checking gearbox oil levels, and maintaining correct track tension) remains the responsibility of the owner as detailed in the user manual.

What tools do I need when it arrives?

You will only need basic tools to snip the transport straps securing the unit to the pallet. Once unstrapped, turn on the battery isolation switch and drive it straight off the pallet.

What's Included in Your Gold PDI?

Saves Approx. 4 Hours Assembly Time & Includes 2L Gearbox Oil
  • Full Structural Assembly: Complete mounting of the chassis base, main drop-side panels, and tipping mechanism.
  • 2 Litres Gearbox Oil Included & Pre-filled: Filled to the precise operating level so you do not need to purchase oil separately for initial setup.
  • Electronics & Cable Calibration: All wiring harnesses connected, switches tested, and drive/steering cables correctly tensioned.
  • Wooden Crate Disposal: We uncrate the machine in our workshop and dispose of the bulky wooden crate packaging for you.
  • Workshop Test Run: Physically function-tested in our workshop to verify forward/reverse drive, braking, and electric tipping operation.
  • Palletised Secure Transport: Delivered fully built and safely strapped to a wooden pallet for easy drive-off delivery.

Standard Delivery vs. Gold PDI Assembly

Feature Standard Delivery Gold PDI Service
Initial Assembly Approx. 4 Hours (2 People Needed) 0 Minutes (Fully Assembled)
Gearbox Oil Buy & Fill Separately 2L Oil Included & Pre-filled
Crate & Packaging Customer Disposes of Large Wooden Crate Uncrated & Recycled by Titan Pro
Wiring & Cable Setup Self-Connected & Tensioned Calibrated by Workshop Techs
Ongoing Maintenance Owner Responsibility Owner Responsibility

Customer Checklist & Ongoing Maintenance Notice

  • Initial Setup Included: Gold PDI covers complete physical construction, electrical connections, 2L gearbox oil fill, and drive testing prior to dispatch.
  • Battery Care: While batteries receive a test charge during PDI, we recommend charging the battery pack overnight before your first heavy working session.
  • Routine Maintenance: Regular operational maintenance (such as monitoring track tension, checking gearbox oil levels, and keeping track gear clear of debris) remains the owner's responsibility.
Write a review

Customer Reviews

Review this product

You must sign in to post a product review.

Secure online payments with

Your Payment Options